Heating Solution For Building Material Processing Industry

We completed a government villa central heating project in Ulaanbaatar, Mongolia. Facing strict residential environmental requirements and low-quality local coal fuel, we customized a high-standard low-emission coal hot water boiler system.

Model: CDZL1.05-85/60-SCI
Location: Ulaanbaatar, Mongolia

Share To:

Brief Introduction

We completed a government villa central heating project in Ulaanbaatar, Mongolia. Facing strict residential environmental requirements and low-quality local coal fuel, we customized a high-standard low-emission coal hot water boiler system. Thanks to urgent priority production and on-site engineer guidance, the equipment was successfully installed and commissioned on time to guarantee seasonal heating for the whole villa community.

case_detail

Project Overview

This is a government-invested villa district heating project located in the suburban area of Ulaanbaatar, Mongolia. The complete boiler system is responsible for centralized space heating and domestic hot water supply for local residential villas. Due to the boiler room’s close distance to residential buildings, the local government set extremely strict environmental and emission control requirements for the heating equipment.

Project Challenges

Poor local fuel quality:

The local coal has low calorific value, poor overall quality and high pollutant content. Conventional coal-fired heating equipment is prone to excessive flue gas emissions and fails to meet local environmental standards.

Extremely tight construction schedule:

The local official heating season starts in October, while the customer only completed payment at the end of August. This left an extremely short cycle for equipment manufacturing, delivery, on-site installation and commissioning, bringing huge time pressure to the project.

Customized Solution

According to China’s highest environmental protection standards and the actual local fuel conditions, we customized a high-efficiency and low-emission coal-fired hot water heating system for this villa community.

The adopted model is CDZL1.05-85/60-SCI Coal Hot Water Boiler. The equipment is specially optimized for low-quality coal fuel, ensuring stable heating output while greatly reducing flue gas pollutants to meet ultra-high local environmental requirements.

On-site Service & Schedule Guarantee

01
Emergency priority production arrangement
Immediately after order confirmation, we launched emergency priority production, fully compressing the overall equipment manufacturing cycle to cope with the tight project timeline.
02
Professional on-site technical support
Our professional engineers were dispatched to the local project site to provide one-on-one guidance and assist with boiler room construction and equipment installation work.
03
100% on-time project delivery
Supported by efficient production capacity and reliable on-site technical services, the complete boiler system was fully delivered, installed and commissioned before the heating season, with zero delay to the customer’s seasonal heating plan.

Project Benefits

  • Stable and sufficient central heating and domestic hot water supply for the entire villa community
  • Custom low-emission design adapts poor local coal quality, fully meeting strict residential environmental standards
  • Emergency production and on-site technical support guarantee zero delay for urgent seasonal heating project
  • Durable and reliable operation with our standard 2-year full machine warranty and lifelong remote technical support